2021 Chiayi City National Water Environment and Clean River Plan

Absrtact
Project summary 1. Project name: "2021 Chiayi City National Water Environment and Clean River Plan " 2. Project execution unit: GEGA ENGINEERS & CONSULTANTS CO., LTD. 3. Project host and project manager: Vice GM Chen, Wei-Hsien 4. Project start time: May 31, 2021 5. Execution end time: November 30, 2021 6. Project Budget: NT$3.144504 million 7. Implementation results: (1) Removal of garbage on the river 1. At least 8 inspections of rivers and regional drainage and rainwater drainage into rivers every month, and a total of 64 inspections have been completed. 2. At least 4 times a month to carry out the interception of ground water body garbage, and 25 interceptions were executed in total, and a total of 110.13 metric tons were removed.  (3) Reporting of river garbage removal data 1. Submit a monthly report every month. This plan is to submit a monthly work report in accordance with the regulations before the 5th of each month, a total of 6 submissions. 2. The designated garbage classification operation shall be completed once every season, for a total of 25 times. (4) Evaluation of the results of the interception of rubbish in surface water bodies 1. Perform ground water inspection operations, and fill in the "Surface Water Garbage Removal Management System" on the Internet before the 10th of the following month. A total of 64 inspection results were completed and 22 points were scored. 2. Surface water body garbage interception operations, and fill in the "Surface Water Body Garbage Interception Management System" before the 10th of the following month. A total of 25 interception results have been completed and 24 points are scored. 3. Handle the clean stream activities or other related activities one by one, and fill in the activity announcement and results in the "Surface Water Body Garbage Removal Management System". On September 24, 2021, handle the Bazhang Creek Clean Stream activity, and complete 1 session in total , Score 14 points. 4. During the planning period, cooperate with the assessment project to perform various tasks, and score a total of 60 points.
Keyword
Clearance and collection of river garbage, River garbage, Clean river
Open
top